Fraction Servers is trusted by many large digital entertainment and cloud service providers and in a world where focus is increasing on environmental sustainability the new site has been designed to utilise the latest hyper-efficient green technologies.
Anthony Parrington, Head of Cloud Service delivery comments “For the new site we have opted for a chilled water based cooling system with enclosed hot and cold aisles. The cooling system ensures we achieve the lowest possible PuE without having to bring external air into the building.
The new site is being built to a specification that exceeds Tier III design standards and will ensure ultra high availability of power, cooling and network services to all customers. Power to the site is being provided by diverse high voltage electrical supplies with 2N+1 transformers situated within dedicated isolated switchgear buildings.”